Clearance contract

Hangzhou Qijia Home Network http://hangzhou.qeeka.com
Owner (hereinafter referred to as Party A): Telephone:

Construction Team (hereinafter referred to as Party B): Telephone:

In a friendly and cooperative attitude, Party A and Party B signed the following contract under equal and fair conditions in accordance with the relevant laws such as the "Contract Law".

I. Project Overview

Project address:

Second, price

Clearance fee: ¥5200, capital: Wu Haoyuan

Among them the hydroelectric yuan

Woodworking yuan

Tileworker

Painter

Garbage clearance freight

Third, payment methods

1. The construction team enters the stadium and advances the living expenses: 1,000 yuan

2. Carpentry is completed, pay 1000 yuan

3, bricklayer completed, pay 1,000 yuan

4, the project is completed, pay 1,800 yuan

5, 400 yuan warranty, paid after 1 year from the date of completion

Fourth, design

1. If Party A has drawings, Party B shall provide Party B with a set of drawings and be responsible for the delivery of the work.

2. If Party A does not have drawings, Party B shall submit clear requirements to Party B, and Party B shall draw a draft for approval by Party A before construction.

V. Materials

1. Party B shall provide Party A with a list of required materials for purchase within 3 days in advance. Party A shall promptly purchase materials for the construction team within 4 days. Both parties shall bear their own responsibility for delaying the construction period and economic losses.

2. Without the consent of Party A, Party B may not purchase materials by itself. If it has been purchased, Party A has the right to refuse to use it and may refuse to pay for the material.

3. Party B shall purchase materials at the building materials supply point designated by Party A and issue official invoices.

4. Party B shall accept and accept the quality of the building materials purchased by Party A. It is found that quality problems should be promptly raised to Party A and have the right to refuse to use it. If Party A insists on using it, Party B shall request Party B in writing and bear the loss caused by the quality of the material.

5. Party B shall help Party A to receive the goods and check the accuracy of the quantity and accessories.

6. Party B shall do a good job of custody of materials, and it is forbidden for people to enter the site.

7. Party B shall ensure that there is no double bag and half bag in the area.

8. Party B shall do a good job in the protection of finished products for construction.

9. Without the permission of Party A, Party B shall not carry any building materials to go out. If such phenomena are found, the price of materials shall be doubled from the labor cost.

Sixth, duration

From January 2004 to January 2004, the construction period is days, because of delays by Party A, the construction period is postponed. Because Party B delays the construction period, Party A can deduct the labor cost of Party B by RMB 50 per day.

Seven, material handling

The Party A materials shall be sent downstairs to the site where the project is located. Any construction personnel of Party B shall be carried unconditionally.

8. Garbage removal and transportation

1. Garbage bagging

2. Rubbish should be cleared on a daily basis

3, Rubbish shall be transported by Party B to the garbage dump site specified by the property

IX. Workforce Management

1. Before the commencement of the work, Party B shall provide Party A with a copy of the ID of all construction workers.

2. Without the permission of Party A, non-site construction personnel may not stay overnight on the construction site.

3. Party A shall promptly handle the community access documents for Party B and pay related fees.

4. Party B shall have all the documents for temporary stay in Shanghai. The related losses caused by incomplete documents shall be borne by Party B itself.

5. Party B designates the person in charge of the site as the replacement person in charge.

6. Within the contract price, Party B shall provide follow-up Party A's selection materials.

7. Party B shall not arbitrarily change the construction personnel without the consent of Party A. Every day, the site must maintain more than 2 (1) persons of construction personnel.

8. Without the consent of Party A, Party B shall not suspend or complete the work under any circumstances.

Tenth, construction machinery

1. Party B brings the necessary tools for construction, and guarantees the safety and good use of the tools. Party B shall bear the tool maintenance costs on its own.

2. The consumables (such as drills, saws, etc.) generated by the tool shall be borne by half of Party A and Party B respectively, and Party A shall purchase the goods, and settle after the completion of the project.

XI Site Management

1. It is forbidden to use open flames on the scene.

2. Smoking is prohibited on site.

3. Paint materials must be placed separately from other materials.

Twelve, maintenance

1. Due to the quality problems caused by the construction of Party B, Party B shall repair it without compensation within two years.

2. Ordinary maintenance Party B shall promptly repair within three days after Party A informs Party B. In special circumstances (water and electricity problems), Party B must arrive and repair within 24 hours.

3. If Party B fails to complete maintenance in time according to the contract, Party A can arrange for other construction teams to perform maintenance work. The labor costs incurred are deducted from the warranty.

XIII. Contract Annex

1. List of construction projects.

2. Both parties agree on the quotation.

3. List of materials purchased by Party B.

XIV. Contract Dispute

1. There is dispute between Party A and Party B before negotiation.

2. Negotiations may not be filed in the disputed court.

Fifteen, decoration requirements

A. Decoration process

"Circuit installation process requirements:

1. When the circuit is installed, the product material must have a certificate of conformity.

2, three-wire installation must use three different color standard. In principle, red, yellow, blue, and FireWire colors. Blue, green, and white are line markers, and black and yellow-green lines are ground color markers.

3. When all the conductors are installed, they must be pierced with corresponding pvc pipes and buried in the previously chiseled groove with a depth of 4 × 3 cm. If the side-by-side line groove is widened, it must not affect the construction of other types of work. If necessary, Negotiating with wood and bricklayers to solve the problems in construction, there must be no work style that cares only for themselves and does not care about the overall situation.

4. All lines must be distributed in a horizontal and vertical direction. Spider web distribution is strictly prohibited. The pvc pipe should be about 3cm into the main switch box, and then be distributed along the wall, along the ground, with a 90-degree elbow or hose connection at the corner and fixed with a pipe clamp. All wires cannot have connectors in pvc tubes.

5. The wire diameter of the embedded wire is calculated according to the power of the electric appliance. The air conditioner, the Yuba, the electric water heater and the refrigerator must be put in place from the switch box.

6. The length of all embedded conductors left at the junction box is 20cm. According to the cable box, cement mortar must be used to seal firmly and keep it upright without being skewed. The joint should be slightly lower than the wall about 0.5cm. The total switch box size can be determined by how much the customer uses the wire.

7. After all the wires are in place and confirmed, the power test can be performed by connecting all the power connectors to the lamp cap and putting on the 15w light bulb. If the power supply is turned on, it indicates that the circuit installation is basically qualified. At this time, the project can be filled. single. Please sign and accept the other types of work, and the electrical concealment project will be completed.

8, install a variety of lamps and switch panels, need to paint before the relocation of the three days or the last time the oil comes into play, the top of the large chandelier must be fixed in advance with a 4 × 3cm expansion Luosi wooden, and then the chandelier fixed Rose Cut on the wood side. The panel installation of all switches must be flat and must not be skewed. When the ceiling lamp is installed, the fixed rose must be cut on the wooden rake. It is forbidden to cut it on the gusset plate (this rasper can be installed by the carpenter in advance).

9, telephone lines and cable television lines must not be the same with the wire in a pvc pipe must be their own way. ”

"Waterway process installation requirements:

1. The used 6-point water pipe or aluminum-plastic composite pipe must be a qualified product that has passed inspection and delivery.

2. During the construction process, all the tubing connecting joints must be wrapped with hemp and white paint and tightened. They should be placed horizontally and vertically. In case of crossover of the ground pipelines, the secondary ducts Bridges must be installed below the main pipe to keep the overall pipe distribution on a horizontal line.

3. The water pipes that pass through the balcony must be buried in the 4cm deep groove on the ground or wall surface of the original rough house, and then the cement shall be used to seal the groove.

4. After the pipe is in place, you must use the pipe clamp to grip the pipe at the turning point or where there is a stop or stop. Do not loosen the pipe.

5, all the places where the water must be installed under the water pipe and floor drain, the pvc pipe of the pipe must be connected with a special pvc glue coating evenly. And note that when the horizontal drop is connected to the main sewer pipe embedded in the original blank house, it should remain stationary for 6 hours.

6. If the main sewer pipe embedded in the original blank room is not enough or not ideal (not in position), the sewer pipe can be re-opened in the floor according to the actual situation, and the pipe with fireproof rubber can be used to seal the pipe. The newly sealed area is surrounded by a mortar with a height of 10mm. After the solidification is completed for 58 hours, the circle is filled with water. After 24 hours, it is infiltrated downstairs to see if there is any water seepage around the newly installed water pipe. For example, if it is not proved that the new pipeline is qualified, on the contrary, the pipeline must be reprocessed, and then the seepage test should be conducted until it is qualified. ”

Brush the wall 1 Brush the walls before removing some of the water putty on the roof and do the patching

2 Once again 108 glue two times putty primer paint two times the same ceiling paint

3 Pay attention to the amount of water required for latex paint

4 Each brush on the wall requires the owner to check it.

Package door cover 1. Demolition of the original door frame, large core board substrate, beech wood veneer, beech wood solid wood door line. Door line width is not more than 55mm, thickness is not more than 10mm.

2. Paint: Polyester varnish 3 times.

3 Use a bandage or kraft bag between the wall and the door pocket

Package door, dumb mouth acceptance criteria

1Required to be horizontal and vertical, ±1mm within 2m, each part of the exposed part is chamfered 1x45°, all angles of yin and yang must rely on squares

2 Plumb the vertical degree on the door cover to check the verticality

Package door 1. Multi-layer board pressing, edge banding, flat panel shape (door size not more than 1000mm

Clearance contract paint switch cement door price renovation home

There is a limited number of on-site group buying activities. Register now

Related Reading
"Cleaner contract" template

Owners (hereinafter referred to as “Party A”): Telephone: Construction Team (hereinafter referred to as “Party B”): Telephone: In accordance with the “Contract Law” and other relevant laws, Party A and Party B sign the following contract in an equal and fair manner in a friendly and cooperative manner. I. Project Overview Project Address: II. Price

2012-08-30 16:45:17
Cleaning accessories decoration contract model

Owner (hereinafter referred to as Party A): Telephone:

2009-12-08 09:23:06
Decoration contract for your reference

Family Home Decoration Engineering Contract Party Owners: Telephone: ID Card: Address: Party B Construction Team: ID Card: Address: Party A and Party B shall sign in an equal and fair condition in accordance with the "Contract Law" and other relevant laws in a friendly and cooperative manner. Set the following contract. I. Project Overview Project Address: Use Area: II. Quality Requirements and Price The project construction should meet the following construction standards. If the standards conflict, the higher ones shall prevail. 1

2016-12-30 11:15:19
Clearance contract

Clearance contract

2009-11-12 15:07:15
Construction contract

Hangzhou Qijia Household Website http://hangzhou.qeeka.com Employer (Party A): Contractor (Party B): Qualification Level: Party A and Party B shall enter into this decoration contract after reviewing Party B’s decoration qualifications in accordance with Chinese laws and regulations. The specific terms are as follows: 1. Project Overview:

2012-08-30 16:45:17
There have been 0 comments


submit

Recommended Area Popular Atlas Popular Information Popular Questions and Answers Hot Products
Southern Cement Cement Sinks Self-made Cement Cabinets Clear Packing Cement Self-leveling Flooring Cement Cabinets Price Clearance Contracts Cement Stairs Cement Concrete Floor Paint Yellow Sand Cement Cement Brand Cement Floor Paint Cement Cabinet Door Decoration Design Conch Cement Home Furnishing Skills Three Space Walls巧收纳普 LED Light Source Dulux paint True and false Distinguishes the advantages of the focus stove 100 square meters Basic decoration 100 square meters Basic decoration budget 110 Flat house decoration costs 120 Renovation budget 140 Flat house decoration Budget decoration design Effect drawing Renovation design figure Living room decoration design Renovation network renderings Renovation TV background wall renderings Renovation staircase renderings Renovation case diagram Renovation model room Picture Renovation wooden door renderings Penghu decoration Xiamen decoration extension installation Yancheng decoration Yantai decoration Yichang decoration Zhenjiang decoration Zhuhai decoration Zibo decoration What hood is easy to use waterproof How much is the ceiling of the coating? How much is the ceiling? What kind of anti-theft door is good? How much is the living room? How much is the living room? What is the bathroom floor tile? What is the good bedroom door? The feng shui Siemens electric water heater is how the kitchen and toilet lamp ceiling lamp brand ceiling lamp price energy saving lamp price LED LED lighting source lamp lighting price Lighting

COB Downlight

cob led downlight 10w,recessed cob downlight,cob ceiling downlight,cob led down light

HSONG LIGHTING CO,. LTD , https://www.hsonglighting.com

Posted on