How to choose the shear wall reinforcement support system how to assemble?

one. Template assembly rule

Reinforcement of shear wall formwork is an important part of building construction and plays a vital role in the quality of the project. The assembly rules are as follows

The assembly of the formwork should be assembled into a whole according to the size of the template plate. When assembling on site, it is necessary to control the joint between adjacent plates, and the joints of the beam and plate should be treated with anti-seepage measures to prevent leakage. Assembly accuracy requirements are as follows:

1. The joint between two templates is ≤1mm

2. The height difference between adjacent templates is ≤1mm

3, template flatness ≤ 2mm

4, template plane size deviation ± 3mm

When the span of the cast-in-situ beam is greater than or equal to 4.0m, the arch is lifted by 2‰. When the length of the cantilever beam is greater than 2.0m, the arch is spanned according to the span of L/200, and the arch height is not more than 20mm.

Pallet wall template matching principle: long side package short side, the template should be horizontally matched as much as possible, the size must be accurate.

1

Two . Shear wall formwork reinforcement support system selection criteria

In the process of template assembly, in addition to strictly following the above operational specifications, the shear wall formwork reinforcement support system should be correctly selected. The selection criteria are as follows:

1. The primary and secondary keel steel back splicing is accurate, ensuring the average performance of the building body and high toughness.

2. The primary and secondary keels are used together, and the joint surface is evenly stressed and the deformation is consistent.

3. The main keel, the yin and yang angle, the porous plug lock, keep the same horizontal line, the average horizontal tension.

4. The overall rigidity, strength, horizontal load force and stability of the frame system are good.

5. The support structure is simplified, the setting procedure is convenient, the construction operation is simple, the speed is fast, and the construction cost is saved.

1

Changli Tianjian Industrial's new shear wall formwork reinforcement technology, the main keel is welded by two square pipes of the same cross-section and the secondary keels used in conjunction with them are steel square structures, the joint surface is evenly applied and the construction effect is good.

The intersection of the main and secondary keels is contacted by the original "point" and becomes "face" contact. The contact area is large and the force is even. The main and secondary keels are of the same material and have the same deformation. Thereby increasing the strength and rigidity of the template. The flatness deviation of the concrete surface can be controlled within 2mm.

The two horizontal bars connected at the corner of the corner are reinforced with a positive angle lock, which is more firm and not easily deformed. The angle lock is used for reinforcement of the corner of the shear wall and the opening of the hole. The connection is convenient because the ends of the bar are in the same The horizontal plane, so after reinforcement, the 90° angle of the positive angle is guaranteed.

The formwork support has greater bearing capacity, and the rigidity and stability are greatly enhanced. It can reliably withstand the self-weight and side pressure of the newly poured concrete, as well as the load rise force generated during construction, and effectively solve the problem of template joint running.

ABS Plastic Shower

The present invention provides a multifunctional pull faucet, comprising: a faucet body, a drawing part is provided at the water outlet port thereof, and the drawing part is connected to a main channel, wherein at least three are provided in the faucet body A branch channel, and the three branch channels are all connected to the main channel. A multifunctional pull faucet provided by the present invention, wherein the hot water channel, the cold water channel and the water purification channel (pure water channel) are all connected to the main channel , And the main channel is connected with the drawing part on the main body of the faucet, so that the drawing part can obtain the water quality (hot water, cold water, purified water or pure water) required by different users, thereby improving the user experience, and , By integrating the hot water channel, cold water channel and pure water channel (pure water channel) into the main channel, the internal structure of the faucet is simplified, and the production cost of the faucet is reduced.

Abs Plastic Shower,Shower Head Set,Brass Shower Head,Color Changing Shower Head

Yuyao Zelin Sanitary Ware Co., Ltd , https://www.zelinshower.com

Posted on