Dirty construction site renovation to protect your attention?

Wet cement, muddy ground, dust flying around, hammer hammer everywhere ... ... some people may say that the renovation of the construction site is the case. In reality, the poor construction site is likely to cause damage to the original equipment and finished products. Today we take a look at what needs to be taken care of in the renovation construction site protection.


The plates are most afraid of dampness and bending deformation. In addition, there are many construction tools on the construction site, which can easily cause safety hazards. Therefore, there should be specially designated areas for placing materials and tools to facilitate access and make the site more secure.

During the renovation construction, care should also be taken to prevent the finished product from being damaged. In addition to protecting the original windowsills, the site also made wooden boxes to prevent the sliding door from being stepped on.

Many construction teams will randomly pile cement on the balcony and completely exceed the weight of the balcony. Locations should be designated to avoid danger and reduce dusty conditions.

After the construction of the decoration, the ground protection shall be carried out after the tiles are finished, so as not to scratch the floor tiles when the woodwork enters the market. Before the ground tiles are solidified, do not walk around or stack debris to avoid loose tiles or unevenness.

Doors and windows and bay windows have to be fully protected. For the already installed central air conditioning is also good to protect the air outlet.

Edit reminder

Even the best design proposal must be achieved through one-to-one decoration construction. Besides good craftsmanship, we must pay more attention to the details. Now that the owners are familiar with the construction standards, they will be able to look at the construction sites from time to time. However, it is difficult to see the doorway, especially for details. It is even less understanding. If you do not feel at ease, you should also look for more well-known, more senior decoration site is better, do not leave behind due to chance.

Decoration construction knowledge construction

Medical Industry Mass Flow Meter

Sealand is a professional manufacturer of Medical Mass Flow Meter, Medical Mass Flowmeter, Medical Coriolis Meter, Medical Flow Meter, Medical Flowmeter, ATEX, IECEx & CE approved.

There are 2 optical switches for operation. The SET and SELECT optical switches are used to navigate the transmitter display. To activate an optical switch, move your finger 1~2mm over the optical switch close to the glass.






Mark:
1. The display will timeout without any operation in 5 min.
2. During numbers input, the decimal point will come up automatically if the first digit is 0; if not 0, please activate SELECT until decimal point shows up.


The general operation is listed as follows.

On Main Interfaces

Activate SET to alternate mass and volume values.

Activate SELECT to alternate main interfaces.

Long activate SELECT to go to Setup Interface.



Long activate SET for total reset.




Back to Main Interface



Long activate SET & SELECT at the same time.




Select Submenu, Parameters & Numbers

Activate SELECT to select the submenu, parameters or numbers.

Activate SET to go to submenu or save parameters/numbers.

Save setup

Long activate SET to save the modified setup.

Back or Exit

Long activate SELECT.








Medical Mass Flow Meter, Medical Mass Flowmeter, Medical Coriolis Meter, Medical Flow Meter, Medical Flowmeter

Zhejiang Sealand Technology Co., Ltd. , https://www.sealandflowmeter.com

Posted on