The old supervisor concluded that going to the construction site to see this 8 points is enough!

Even though modern decoration, supervision, and inspection of houses are becoming more and more standard, but there are still many non-standard constructions or ubiquitous as owners, we still have to know that some of the most basic are not to do small white in the white, referred to as "white "White" so Xiao Bian deliberately put an end to the eight-point renovation when the construction of non-standard practice after going to their own construction site to see it! Kitchen waterproof The waterproof process at the bottom of the kitchen wall is very important. Many workers directly use bricks to make the density at the bottom of the wall loose, resulting in poor waterproofing. PS: The correct construction should be to make a concrete wall 20cm above the ground, and then use bricks. After the wall and floor are leveled, use water-proof paint and waterproof waterproof mortar for the wall to make waterproof twice. After 24 hours, close the water test and then tile the tiles to ensure the waterproof performance of the wall. 2. Hidden project In the acceptance of hydropower, it is common to see water, electricity, and gas pipelines tightly affixed together and no proper distance is reserved. This can easily lead to hidden dangers. PS: The laying of the pipes should be kept at a distance of 10 cm or more in parallel and the distance between them should be 5 cm or more. For places where strong and weak tubes are connected, wire tubes are best wrapped in tin foil. The minimum distance between hot and cold water pipes is 3cm, and the distance between gas pipes and water pipes is 15cm or more. In case of a leak in a certain pipeline, it will not affect other pipelines. 3. The lintel at the top of the doorway
If the structure in the space is reformed, then the new masonry hole is a must, and the most likely cause of irregularity for the constructors is the concrete lintel at the top of the door opening. The lintel is the basis for the structural stability, which can guarantee that the new masonry hole will not be deformed in the long-term use in the future. In order to cut corners and replace materials with wood lintels, construction workers are not only vulnerable to moisture deformation, but also have even a layer of cement on the outside of the brick walls. As a false lintel, the owners must be careful. 4. Slotted wall backfill Some owners were upset that the house that had not been occupied for a long time was found to have cracked in the wall of the original hydropower pipeline. In fact, when the slotted wall is backfilled, there must be a lot of attention to the details of the construction. We must use water to wet the tank and backfill with cement mortar. The reason is that when the old and new walls are connected, the dry wall will come into contact with the wet cement and absorb the water, so that cracks will occur in a long time. 5. Discharge pipe displacement There should be different requirements for home improvement. Some sewage discharge pipes need to be moved. Care must be taken in the part where the moving sewage pipe is connected to the ground, otherwise leakage is likely to occur. PS: Through the hanging mold construction, after the cement is divided into two waterings, the floor is treated with water-repellent treatment and the water-removal test is performed for 24 hours. The pipeline displacement work is considered to be in place. 6. The concealed pipe was not marked Kitchen and toilets usually install some brackets, and often accidentally cut the internal pipeline and cause leaking water pipes. Therefore, at the same time as the concealed project is completed, it is necessary to mark the position where the pipeline passes through in time to ensure that the pipeline will be placed on the pipeline during the later period of drilling. 7. Circulating hot water line Nowadays, families are more respected with geothermal heat. As a whole-house circulating hot water of a comfortable system, the use of three links in the middle of the return pipe is not correct, and the water at the other end of the return pipe will not be able to flow back, causing inconvenience in life. 8. Stealing
The most common jerry-building cuts at the construction site are the budgets for raising the budget. It is plain that the materials did not follow the budget. Generally, water pipes, wires, switch panels, etc. at the construction site will be replaced by brands other than budgets. The above pictures are from the web search
Finally say two sentences
I hope that Xiao Bian's ordering can bring you some references when you are in your home wear. You can let the parents lose some of their confusion in the decoration, and make a point more determined. This is the biggest motivation for Xiao Bian to write the article. We'll see you next time!

Decoration construction knowledge

Carbon Steel Four Way

Carbon Steel Cross,Equal Carbon Steel Pipe Cross,Equal Butt Welding Connection Cross,Forged Malleable Casting Iron Cross

Cangzhou Youlong Pipe Fitting Manufacturing Co., LTD , https://www.youlongpipe.com

Posted on