To decorate a new house, for most people, the big girl is on the sedan chair - the first time, so it has become a common choice for the decoration company to take care of it. However, living is what they are doing, but the house is still ours. The construction quality must be strictly controlled. The renovation project is complex and requires a lot of knowledge to understand. Today, Xiao Bian will take everyone to make clear the process of house decoration and precautions .
House decoration process and matters needing attention:
1, pre-design
The first step in quality decoration: to find a reliable designer, unlike the decoration of the guerrillas in disorder, find a suitable designer, can provide you with custom design, according to your own living habits, to optimize the use of space, You can also give advice on home furnishings configuration.
å‹ Friendship reminder: Before the renovation, we must conduct a detailed measurement of the house. Don't be lazy. It is best to measure it yourself. The contents of the measurement mainly include: the area involved in the renovation process. In particular, the tiling area, wall paint area, and floor area; and the main wall size. In particular, it is necessary to design the wall size of the furniture later.
2, the main demolition reform
To the construction stage, the main demolition reform is the first project on the top, mainly including the demolition of walls, walls, spade wall, demolition heating, change steel windows and so on.
When the main body is dismantled and reformed, it is to put the framework of the construction site first.
➤ Friendship reminds: The load-bearing wall can never be worn or demolished. It will reduce house safety and shock resistance, and it will become a dangerous house in the second.
3, hydropower reform
Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Between the hydropower reform and main body demolition, the first measurement of the cabinet should also be performed. In fact, because the wall surface and the ground are not processed, the cabinet designer cannot give a specific design size, but just put forward some suggestions on the location reserved by the developer for the inlet and range hood.
4, woodworking
In a word, carpenters, bricklayers, and oil workers are the “three brothers†of construction. The basic order of appearance is: shingle oil, and the principle of appearance is “who is dirty?†This is one of the basic principles that determine the order of home improvement.
Actually, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered as a fine part of the main demolition and renovation in a certain sense. They themselves do not conflict with the transformation of water circuits, and sometimes they need some cooperation. .
5, mud tiles
The process of the bricklayer's second job also involves the installation of a threshold stone, a marble window sill, and a floor drain.
1 The installation of the threshold stone: it can be done together with the paving slabs, or after the paving slabs;
2 Installation of marble sill: Generally, after the window covering is completed, the worker who installs marble will prepare glass glue, and conveniently close the marble and window cover with glass glue;
3 Installation of Floor Drain: Floor drain is the first one to appear in home improvement hardware because it must be installed together with floor tiles.
6, oil workers
The “oil worker’s third child†mainly completed the work of basic wall surface treatment, brushing of topcoats, and painting wood furniture.
As for whether or not to stay in the last coat, this problem is not necessarily too true.
7, kitchen and toilet ceiling
The ceiling of the kitchen and bathroom is the leading part of the installation process, and it is still continuing the "packaging" of the home.
At the same time as the ceiling of the kitchen and bathroom, the kitchen's moisture-proof ceiling lamps and bathroom heaters should have been bought. It is best to install the kitchen ceiling lights and exhaust fans (bath heaters) at the same time, or to leave the heads and openings.
8, cabinet installation
After the ceiling is over, the cabinet door can be installed. At the same time, there are also sinks and gas stoves installed. Before the cabinets are installed, it is best to coordinate the property to pass the gas. It is convenient for gas stoves to be installed and need to be tested.
9, wooden door installation
Prior to installation, relevant hardware should be prepared in advance. At the same time, hinges, door locks and ground suctions should be installed. If wooden door manufacturers are required to install window covers and mouthwashes, they must be measured together with wooden door manufacturers and measured at the wooden doors. Installation at the same time on the day of installation. At the same time, consideration should be given to staggering the installation time of the marble window sills after the installation of the window covers.
10, floor installation
Floor installation needs attention:
(1) Before installing the floor, it is advisable for the manufacturers to survey whether the ground needs to be leveled or partially leveled. Some decoration companies or renovating teams will advise the students to level or level the floor. The actual survey of the floor manufacturer shall prevail; You can also play the keel and you can change it later. If you are leveling now and use the keel later, your height will be low.)
(2) Before the floor is installed, the floor of the home's paving floor should be cleaned, and the ground must be kept dry. Do not use water during the cleaning process;
(3) When the floor is installed, the cutting of the floor must be in the hallway if conditions permit. Cutting floors indoors is more serious than wall contamination.
11, diatom mud and other wall construction
Diatom mud is relatively expensive and is recommended for local use, such as the living room dining room wall.
12, radiator
A generally accepted correct installation sequence: wooden door - floor - wall - radiator, first install wooden door to ensure that the baseboard of the floor can be closely connected with the door sleeve of the wooden door, after the wall is decorated because of the floor The installation is more dirty, more dust, and serious pollution on the wall.
13, switch socket
When decorating, you should have a detailed understanding of the location and quantity of each switch socket in your home, especially in the living room, where you need to leave more sockets. It will be very troublesome to avoid the need for late-stage switching.
14, lighting installation
Socket installation is complete, and then is the installation of lamps and the like, nothing special to emphasize, that is, the choice of lamps or as far as practical to think about, consider the requirements of the elderly and children on lighting.
15, hardware sanitary ware
Hardware must buy the brand, this is bad and very troublesome. Water pipes and fittings, bathroom accessories, toilets, drying racks, etc., need to be prepared as soon as possible.
16, curtain rod
After the curtain rods have been installed, they mark the end of the home improvement and make a big breath.
17, pioneer waste cleaning
å‹ Friendship reminder: Before cleaning, do not install curtains. When cleaning, do not have furniture and unnecessary appliances at home. Try to maintain more “flat surfaces†so that you can thoroughly clean.
18, furniture approach
As for the issue of furniture purchase time, it was only after the completion of the transformation of the water circuit that the basic dimensions of the furniture were selected.
19, appliance approach
At this time, the approach of home appliance entering the field, the installation of the installation, almost ready to stay, oh yeah!
20, home accessories
Home accessories, the final step in home improvement, and since it has been transformed from decoration to decoration, you don't have to worry about it! In other words, the installation of curtains, for example, is all part of home accessories. As for the purchase of curtains, it is best to order furniture, in order to avoid style conflicts, but also consider buying some green plants, wall paintings, and various handicrafts.
As a landlord, there may not be much time for decoration, and there is no way to do it. However, the owner must keep the overall situation in check. Therefore, the housing renovation process and precautions must be understood, even if the problem is corrected.
House decoration notice Feng Shui taboo for house decoration
LEDER technology`s LED wall washer offers an increased variety of specification options. It can be installed in a broad range of applications. 35 Degree visual cutoff provides superb glare reduction. It can be installed in a broad range of applications. The LED wall washer is printed on great quality canvas using 12 color.
LED wall washer is widely used because of its characteristics of energy saving, high light efficiency, rich color and long life.There are also many types of wall washing lamps. There are round, square, length and size, which can be selected by themselves. They are suitable for building installation and use of different shapes.
Features:
• Material: Die-cast aluminum
• Eco friendly
• Lumens: Up to 2520
• Color temperature: 3000K
• Rated life: 100,000 Hours
• Dimming: 10% – 100%
• Replaces halogen and fluorescent wall wash luminaires
• Thin side profile
• Warranty:3 - 5 years
The wall washer which is great urban art for any room in your home or office. The LED wall washer with an incredibly ultra low profile design is very modern and fashion.
We have rich production experience in lighting .Except LED Wall Washer, we also offered other product in Outdoor Lighting ,such as LED Flood Light , LED street Light , LED Inground Light, LED Spike Light ,LED Bollard Light ,Outdoor Wall Light & Step Light as so on .
Wall Washer,Wall Washer Light,LED Wall Washer Lights,Outdoor Wall Wash Lighting
LEDER LIGHTING CO.,LTD , https://www.lederlight.com