A new successful construction process for direct-buried bolts of steel-mixed equipment foundation

Steel-mixed equipment foundation directly buried bolts. A successful construction of new technology requires a deviation of less than 2mm. The main inclined shaft wellhead room, frame structure, independent foundation, 4 floors, construction area of ​​1400m2, volume 1300m3, plane axis size 18mx35

Steel-mixed equipment foundation directly buried bolts. A successful construction of new technology requires a deviation of less than 2mm.

The main inclined shaft wellhead of the Gaolan Mine in the Gujiao Mine Area of ​​Shanxi Province, frame structure, independent foundation, 4 floors, construction area of ​​1400m2, volume of 1300m3, plane axis size of 18mx35m, height of 21.6m, a large equipment foundation, concrete strength grade C25, The volume is 20m3, which is the basis of the belt drive device of the main inclined shaft. The base height is -4.2m, sitting on the sand pebble layer, and the height of the bolt of the pre-embedded equipment is 73.4m on the ground.

According to the design requirements of the drawings, the leather bandwidth is 1 200mm, the design tension is 1208, the driving device includes the head roller, the driving roller, the funnel, etc.) The bolts include the M56 9 buried method, and the construction scheme of the secondary pouring concrete for the reserved holes is not allowed.

In response to the above situation, we conducted several research discussions. If the method of bolting alone is used, the design requirements cannot be met. If the steel is used for reinforcement, not only the bolt displacement will occur during the welding process, but also the overall displacement of the steel frame during the concrete pouring process, it is difficult to ensure the quality of the bolt. It may also cause a quality accident. After many arguments, the construction plan was finally determined as follows: the basic earthwork excavation, firstly construct the frame independent foundation and frame column to: 0.00, partially backfill the earthwork, then pour the foundation of the equipment, and add the retarder to the equipment foundation concrete. Implement a two-shift system for day and night construction. In order to reduce the heat of hydration, the slag Portland cement is used, and the concrete equipment foundation is applied to 71.6m at a time, that is, the bottom of the bolt is 20;m. In order to ensure that the construction joints are firmly combined, set the steel bars! 251000 two-way arrangement, buried in the concrete 50; m, leaving 50; m in the upper part, and pre-cut iron parts.

Vertical channel steel = 12 brackets, and channel steel. Beijing: China Building Industry Press, 1992, editor of Tongji University. Water treatment. Beijing: China Building Industry Press, 1998

High Flow Peristaltic Pump

The working principle of a High Flow Peristaltic Pump like a snake swallowing an egg. The hose is constantly squeezed through the roller to make the hose generate pressure and push the liquid forward. Our designers make the Peristaltic pump head and hose fit perfectly by designing precise roller size and pump head structure. So as to achieve the purpose of accurate liquid metering transmission or filling

1. Clean and pollution-free: the fluid only passes through and touches the peristaltic pump hose.
2. High precision: constant current, reproducibility of up to 0.5%, and flow can be precisely adjusted.
3. Low shear force: It is an ideal tool for conveying shear-sensitive and corrosive fluids.
4. Corrosion resistance: it can transport various fluids, such as organic solvents and corrosive liquids.
5. Idling and dry operation: air or gas-liquid-solid three-phase mixed transportation can also be transported.
6. Possess self-priming ability: self-priming, no need to fill the pump, no need to empty.
7. With stop valve function, no siphon, no seals, stop valve and check valve function.
8. Two-way conveying function: reverse pumping and back-suction functions can be realized by changing the direction of the pump runner.
9. Simple maintenance: only need to replace the peristaltic pump hose, no valve and seal replacement.

High Flow Peristaltic Pump,Additive Peristaltic Pump,Polishing Liquid Pumps,Intelligent Transfer Peristaltic Pump