Notice of new house decoration Six elements that must be known for the rookie decoration

The quality of home decoration is the most concerned issue for the owner when they are renovating, but how can one really guarantee quality and make the renovation costs worth the money? The best way is of course to supervise the whole process, and the owner must be very proficient in the decoration of the knowledge, otherwise it may be fooled by the decoration company, but this is basically impossible.


Li Kemai Lighting    Jumei Indian Home Furnishing Museum

In view of the present upset of the decoration of the owners of a sense of loss, Xiao Bian in this to all the owners to support the trick, just a good home improvement in the six key points, when in due time at the time to visit the site for temporary supervision, you can Make your decoration quality greatly improved.

First, when workers enter the market

Before the renovation, the owners, designers and construction team leaders must communicate. In simple terms, it is generally necessary to ensure the contents of the three aspects and lay the foundation for the later work: First, it is necessary to confirm the design of the house. For example, it is clear where the pipes need to be arranged and where they need to be done. To determine the direction of water and electricity coal; Third, to determine the changes in the structure of the housing, these need to communicate well with the construction team and designers.

Workers enter the stadium on the first day, and the designer gives instructions to the construction captain as to how it should be constructed. It contains many details. If the owner has any doubts, he can promptly make corrections. Therefore, the owner must be present when the workers enter the court.

Second, the material when entering the field

At this time, the decoration industry mainly checked whether the material on the budget slip was consistent with the material sent to the site, or if the material was sent wrong, it would be troublesome. Therefore, when the material enters the site, the owner must carefully check the brand and quality at the scene. For the newly arrived tile, not only the brand model should be checked, but also the quality of the brick should be examined to see if there is a color difference.

Third, when doing ceiling structure

When doing the ceiling structure, the owner should also come to the scene, first to check whether the fulcrum around the wall is solid, and then determine whether the wooden keel has been fireproof and antiseptic. Because there are electric wires, electrical appliances, transformers, etc. in the ceiling, in case of electric leakage, it will cause burning, so we must see for ourselves.

The structure of the suspended ceiling is not simple, and it is suspended on top of our heads every day. We must ensure that its quality is safe and secure. The fixing of the suspenders and the top surface of the suspended ceiling should be hammered with nailing screws to make the ceiling safe and secure.

Fourth, water pressure test time

After the water pipes are connected, it is necessary to do a hydrostatic test because it is not clear whether the welded joints are leaky. This test is very necessary, because only after doing the water pressure test can we ensure that there will be no water leakage in the future and we will only relax our mind on this part. Everyone now uses PPR pipes at home to be 1.5 times higher than the daily water pressure. No water leakage is found after one hour, and the water pressure does not decrease.

Because the water pipe is an important part of the concealment project, the water pipe will be sealed immediately after acceptance, and if it is missed, there will not be even a chance for recovery. Therefore, the owner must be personally tested on site.

Five, when the electric tube line

The landlord should go to the site to see before the hydropower line is sealed. It is mainly to ensure three aspects: 1) The capacity of the wire cannot be greater than 40% of the tube, which is also stipulated in the 3.15 standard; 2) The strong and weak electricity can not be put in the same pipe, for example, the computer network cable and the wire cannot be worn in the same In a tube, if this happens, it will not only affect the normal work of the computer, but also may trigger a safety accident; 3) To see where the casing can't bend, because if the wire is hard to wear Over. The arrangement of the conduits of the electrical conduits and the arrangement of the conduits shall also be as horizontal and vertical as possible, and between the power lines and the weak conduits must be separated by ≥30cm.

Sixth, gas installation

When the gas is installed, the owner must go to the site. First, check whether the gas leaks after the gas is installed. Second, pay attention to the location of the gas can not be too close to the wire, otherwise the accidental spark may cause an explosion. And the shower is the intersection of water, electricity, and coal. During the course of use, the temperature will suddenly increase and dip. Therefore, it must not be taken lightly and must be personally tested on site.

Notes Mattress decoration Children's room decoration decoration design home house decoration house lighting decoration cost budget decoration find decoration company okay decoration home

Three-piece Ball Valve

Three-Piece Ball Valve,Platform Threaded Ball Valve,Hreaded Ball Valve,3 Piece Stainless Steel Ball Valve

Wenzhou KAIZHENG Valve Technology Co.,LTD. , https://www.kazevvalve.com

Posted on