1. Acceptance of water circuit
The owner can check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is normal, and reconfirm the actual size of the line transformation under the operation of a professional hydraulic or electrician. Only after the line is changed, can the ash inlay workers seal the wall and putty.
2. Acceptance of carpentry size
After the carpentry foundation has been completed, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are also well-attached, while the painted wall should be scraped twice. Acceptance work at this stage is very important, the owner should carefully check the drawings, confirm the size of the various parts, if found inconsistent place, promptly prompt the construction team to modify.
3. Acceptance of woodwork quality
When all the veneer panels of wood products are well-attached and the wooden thread is nailed, the owner can accept the woodwork quality. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.
Aisle ceiling living room ceiling room bathroom ceiling bathroom size
Led Recessed Spot Light,Led Round Shape Spot Light,Recessed Round Trim Spot Light,Round Module Spot Light
Foshan Brinno Technology Co.,Ltd , https://www.brinnolighting.com