The original color solid wood flooring is based on natural plants, and its color and texture are evenly distributed. Therefore, please prepare some floors properly before construction so as to highlight the primitive and primitive flavors, and tend to be used by people who respect nature, making people feel warm and approachable.
First, preparation before paving 1, the construction site, the ground, walls, wall base need to be clean, dry, smooth ground.
2. Do a good job of preventive inspection before installation, including the inspection of embedded wires and pipes, and whether there is any seepage or water leakage between the kitchen and bathroom.
3. After the other decoration works are completed, install the floor.
4. 48 hours before construction, open the package first and spread it indoors. Eli flooring adapts to changes in ambient temperature and humidity.
5. In order to avoid direct sunlight and water tide on the floor, the installation of doors and windows must be closed.
Second, paving procedures and programs 1. Ground construction line: If the room is surrounded by a rectangular rectangle, you can use the wall as a reference line; if the surrounding is not completely rectangular, use the crosshairs of the room as a baseline, and then divide equally. Dashing (in order to facilitate the installation of the floor straight and evenly split, and each laying 3-5 lines of floor, the cable check once, if not straight, then adjust).
2. A layer of EPE moisture-proof film is laid on the ground. Moisture-proof film plastic surface is smooth, so as not to be damaged. The joints of the moisture-proof membranes need to be overlapped and taped together, and spread to about 5 cm around the corners of the walls to completely eliminate the water vapor in the formation.
3. Lay the keel according to the length of the floor to determine the spacing of the keel; the keel must be firm and flat, and the moisture content meet the laying floor requirements; whether to lay the multi-layer board on the keel depends on the actual needs; if it needs to be laid, it should be laid on the first moisture-proof film. Fully padded 12mm thick plywood, fixed with 7 wooden studs. In addition, 8mm-10mm expansion joints are required for each splint joint. Between the splint and the four walls, expansion joints of about 8mm-12mm are also retained to prevent shrinkage and swelling.
4. Lay a second moisture-proof membrane on the plywood, again blocking the overflow of the underlying moisture, including the plywood.
5, paving solid wood flooring: In order to achieve a smooth line of decorative art effects, taking into account the utilization of the plate, must be based on the baseline in the 1st step of the difference between the base line as the benchmark to start paving. The floor is fixed with 50mm floor screws. There must be 8mm-12mm expansion joints on the floor facing the wall to facilitate the expansion and contraction of the floor and prevent the floor from arching due to moisture. Finally install the baseboard.

2D Wireless 2.4G Handheld Barcode Scanner

2D Barcode Reader,2D Bar Code Scanner,2.4 G Barcode Scanner,Wireless 2D Barcode Reader

Guangzhou Aigather Intelligent Technology Co., Ltd. , https://www.aigathergz.com

Posted on